This project was unique due to the existing tenant operating whilst we stripped out existing floors, racking and staircases.
Each step had to be carefully planned with numerous other contractors required to carry out their works.
Some delays to the overall project occurred but everyone involved played their part in ensuring that the project was ultimately a huge success with the finished article something for the team at Yesss to be very proud of.
Not only did we supply and install the floor and storage equipment, we also provided SEMA training to their PRRS and advice moving forwards on how to prolong the life of their investment.
Flexibility was definitely the order of the day with this one, with the team overcoming challenges to ensure we remained on target.
Working to a tight schedule, the team managed to nearly double the useable space for this Company, allowing for future expansion and even space for racking should it ever be required.